SD Sealants lines image

Finishing repairs at Forest Bridge School

19th May 2021

The SD Team have been on site at Forest Bridge School in Maidenhead, carrying out finishing repairs ahead of opening the brand new premises in Braywick Road.

The specialist school for children with autism has moved into a new state-of-the-art facility this year, with Kier Construction at the helm of the project. Children aged four to 16 will now be able to enjoy a range of new facilities including a science laboratory, drama and music therapy room and a life skills space including cooking facilities.

The SD Cosmetic Repairs team were on site for two weeks carrying out mortar tinting, door repairs and polishing up furniture and desks ahead of opening this March. See below a range of fixtures and fittings that were repaired:

table with large brown mark
table after repair

 

metal bar displaying scratches
metal bar repaired

 

damaged door
door repaired

 

scratch on a door frame
door frame repaired

 

For more information on our cosmetic repairs service, visit the repairs page here.

Found this article interesting? Share online.